For our client RWE Magnum power plant in Eemshaven, we replaced a 100 metres cable at height last week. The cable ran all the way from the chimney to ground level. Our rope access engineers were able to descend along the cable and thus replace it. In addition, a sensor was replaced along the way, so everything is working properly again.