ATI rope access techniques have cleaned the new entrance of the van Gogh museum in Amsterdam. [gallery link="file" ids="6237,6238,6239"]
For a client whoe is specialized in repairing buildings after damage by fire and calamities. ATI rope access have executed multiple rope access work during the rebuild of the whole project. We have removed and assablied all the damaged sliding of the facade. Through the experience of our rope access...
A.T.I. rope access have executed industrial cleaning works at the Omrin waste management plant. Through our rope access technieques we could easily position ourselves at all the hard to reach areas within the plant. [gallery link="file" ids="6250,6251,6252,6253,6254,6255"]
In cooperation ATI rope access techniques installed a lighting conductor on the old church of Breda (97m) [gallery link="file" ids="3311,3312,3313,3314,3315,3316"]
A.T.I. Rope access techniques has completed Non-Destructive testing for Stork at Hengelo. [gallery link="file" ids="3078,3077,3079"]
In cooperation with VDS Staalbouw A.T.I. Abseiltechnieken have executed several maintenance work on the Pacific Orca at Flushing. [gallery link="file" ids="5091,5092,5093,5094,5095,5096"] Extra voordelen rope access / abseiltechnieken Werken volgens IRATA-systeem A.T.I. Abseiltechnieken is als bedr...
In cooperation with DONG Energy, A.T.I. Abseiltechnieken have executed rope access work on several TP’s at the Eemshaven, Netherlands. [gallery link="file" ids="3005,3006,3004,3003,3002,3001"]
A.T.I. rope access techniques has completed assembly work in a confined space. Through our rope access techniques the location could be easily reached and we could perform the maintenance work safe and efficient. [gallery link="file" ids="2967,2968,2966,2965,2964,2963"]
In cooperation with Vlietsra cleaning company A.T.I. rope access techniques completed cleaning work at a silo of Frieslandcampina Leeuwarden. Through our rope access techniques the inside of the silo was easily accessible and we could clean the complete inside. [gallery link="file" ids="2677,2676,26...
In cooperation with Cofely North A.T.I. rope access techniques have completed installation works at an big bulk terminal. At the inaccessible areas our rope access technicians have installed and bundled all new cables for the constructions of the terminal. [gallery link="file" ids="2568,2567,2569,25...